These images show the magnitude of the repair project to get The Education Center at Old Colonial up and running. A lot of work has already been done, but the building is still a work in progress.

​

As you look over these images, see if you can hear the voices of children running through the halls to their next class. We can!

​

Here are several images of the outside of the building. It's all brick and in good shape.

​

aIMG_0472

This is the Front of section B, circa 1939.

aIMG_0516

This is the Front of section B, circa 1939.

colonial

This is the Front of section B, circa 1939.

aIMG_0471

Looking from section B toward the gym.

aIMG_0520

Looking down the parking lot in front of the building.

aIMG_0515

The old Colonial Elementary School sign, which we will replace.

aIMG_0518

A side view of section A.

aIMG_0523

Outside view of the gymnasium.

aIMG_0524

Looking from the gym toward the other wings of the school, in front.

These images show the inside of the gymnasium and library.

aIMG_0479

The gymnasium from the floor. New ceiling tiles are sitting on the floor, awaiting installation. We will be selling sponsor ads on the walls of the gym. Would your business be interested?

aIMG_0478

The gymnasium from the top of the bleachers. New ceiling tiles are sitting on the floor, awaiting installation.

aIMG_0475

The library. The shelves on the right house books for the start of our child-safe library.

Here are hallways near the front entrance, and the front doors viewed from the inside.

aIMG_0474

Section C hallway.

aIMG_0473

Section C hallway looking toward the gym.

aIMG_0476

Section C classroom. Vandals broke the windows.

aIMG_0477

Section C classroom.

aIMG_0512

The front doors and lobby.

Three rooms had so much water damage from the leaking ceiling that all the original hardwood flooring had to be removed. This will be replaced with plywood and carpeting.

aIMG_0480

A small room that had water & mold damage. The hardwood floor was ruined and had to be removed. This will require installation of plywood and carpeting.

aIMG_0506

A classroom that had water & mold damage. The hardwood floor was ruined and had to be removed. This will require installation of plywood and carpeting.

aIMG_0507

A classroom that had water & mold damage. The hardwood floor was ruined and had to be removed. This will require installation of plywood and carpeting.

The original, 1939, section of the building has a lot of character, including this natural theater space with >20ft ceiling and a stage with lighting.

aIMG_0481

The original entrance doors to the oldest section.

aIMG_0483

The theater.

aIMG_0494

The stage in the theater. Stage lights are installed. One window in the back was smashed by vandals and will cost about $6000 to repair.

Section A is the newest classroom area of the building. It also had extensive water damage, but since it sits on a concrete slab the cleanup was easier. The County left much furniture, including many electronic white boards which need to be tested to see whether they are working.

aIMG_0486

Hallway leading into section A. The stains on the floor are from water leaks.

aIMG_0487

Section A classroom.

aIMG_0489

Section A classroom.

aIMG_0491

Section A classroom.

aIMG_0490

Section A classroom.

aIMG_0492

Section A classroom.

aIMG_0493

Section A hallway.

The cafeteria needs a lot of cleanup work, including mold removal in the ceiling, which will be complicated by the utilities running above, and the old wooden roof. The kitchen will need a complete rework to be brought up to code. However, we don't need the kitchen and cafeteria to operate home school co-ops.

aIMG_0497

The cafeteria seating area.

aIMG_0499

The kitchen area.

aIMG_0498

The cafeteria serving area.

The water system for the school runs off a well, with five, 500gal tanks and pumps to pressurize the school's water pipes. Heating and cooling are provided by about 30 HVAC heat pump units, and a chiller and boiler. The latter appear to be in working order, and the well and well pump are working. The entire water system must be tested and passed by local health authorities.

aIMG_0501
aIMG_0502
aIMG_0503

The hallways in section B are in pretty good shape. And a benefactor donated a huge amount of office furniture from an office building.

aIMG_0509

Hallway in Section B. The theater is through the triple window.

aIMG_0510

Hallway in Section B. The theater is through the triple window.

aIMG_0508

Donated office furniture.

The school has this nice outdoor instruction area. There are several playgrounds outside, and two baseball diamonds.

aIMG_0511

Outdoor instruction area.

aIMG_0519

Playground.

aIMG_0522

Playground.

aIMG_0521

Playground.

This is our project to-do board. Our volunteers pick a task and get it done!

aIMG_0513

Project to-do board.

So, what do you think? A huge project, right? But we have made great progress so far, with the help of God and a ton of volunteers and contractors. With your help, there will be children getting a Biblical education here soon! Contact us to find out how you can help!